thatcoder · projects · bowling ball rack

Wood Side Panels with Pipe Rails: 49 Balls

Each ball rests on two horizontal black pipes, so the balls never touch the wood.

Design summary

SpecValue
Capacity49 balls (7 tiers × 7 across)
Footprint64" W × 12.75" D × 72" H
Top of the upper ballsAbout 78"
SidesTwo 2x12s cut to 72" (actual size 1.5" × 11.25")
RailsTwo 3/4" black pipes per tier, 14 total
Rail spacing4.5" center to center
How the rails mountInto blind holes in the side panels. No flanges or threads needed.
Inside width61". Seven balls fill a row snugly, which keeps them from rolling along the pipes.
BracingThree 2x4 stretchers across the back, plus wall anchors
LoadAbout 785 lb fully loaded with 16 lb balls

How the rails work

Tier heights (pipe centerline, from the floor)

Tier1234567
Height3.5"14.5"25.5"36.5"47.5"58.5"69.5"

Clearance above each ball: With an 11" pitch, there's about 2" between the top of a ball and the pipes above it. That's enough to roll a ball forward over the front pipe and lift it out.

Cut list and materials

ItemQtyCut size
2x12 × 12'1Two sides at 72"
2x4 × 8'3Three stretchers at 64"
3/4" black pipe14 pieces62-3/8" each (61" inside width + two 3/4" holes − 1/8" slack)
Pipe source4 × 21' sticks from a plumbing supply house (4 cuts per stick), or 14 × 72" lengths from a big-box store
3" construction screws122 per stretcher end
Polyurethane or spar varnish1 qtFor the sides
Anti-tip straps2 to 3Fasten into wall studs

Tools:

Build steps

  1. Cut the sides. Cut the two 72" sides and clamp them together, inside faces up. Lay out all 14 hole centers across both panels at once so they mirror each other.
  2. Drill the rail holes. Drill the 1-1/8" holes 3/4" deep.
  3. Seal the sides. Sand and seal the side panels, including inside the holes.
  4. Cut and deburr the pipe. Cut the pipe to length and deburr the ends.
  5. Clean the pipe thoroughly. Degrease with mineral spirits, then a degreaser such as Simple Green. Dry the pipe and give it 2 coats of clear enamel. This step matters: black pipe ships with an oil coating, and ball coverstocks absorb oil.
  6. Assemble the rails. Lay one side flat and seat all 14 pipes in its holes. Lower the second side onto the pipe ends.
  7. Attach the stretchers. Stand the rack up. Screw the three 2x4 stretchers across the back edges, at the bottom, the middle and the top. Square the frame before driving the last screws.
  8. Anchor before loading. Strap the top stretcher to wall studs before you put any balls on the rack.

Updated 3D model

Open the 3D model to see the rack from any side.

Notes